top of page

Cabinet Makeover

The process first starts with the preparation. The existing cabinets are stripped of their doors, drawers, and hardware. All of the cabinet boxes and face frames are sanded and prepped. Next the cabinet boxes are encapsulated with a wood veneer or laminate matching the chosen finish by the home owner. New drawer boxes, soft-close glides and

drawer fronts are installed in the same style and composite as the new cabinet doors. The cabinet doors come in various styles, stain and paint color options. The different types of doors include but are not limited to, solid wood (maple, oak, cherry) and composite doors. Different hardware styles are available to choose from for all knobs, handles and hinges. Additional upgrades can be installed including but not limited to: inner cabinet organization components (ex. Lazy Susans, roll-out drawers, tilt-in bins at the sink, etc.), glass doors, crown/toe kick molding, and countertop removal and replacement.


Since the existing kitchen layout is not being deconstructed like in a full kitchen renovation, the installation time is only 3 to 5 days from start to finish. The home owner gets a brand new look and feel to their kitchen while keeping their high quality cabinet boxes.


The cabinet makeover will deliver the absolute best existing cabinet transformation that mimics the look of brand new replacement cabinets.



Σχόλια


bottom of page